Transforming your home into a dream home takes a lot of time and patience. Not anymore! Asian Paints Quick Home Makeover Service, where the state-of-the-art products come together with the safest painting service, to give you a hassle free experience and a dream home – all in just 4 days*









You can fill the form online and provide all the necessary details, following which, you will receive a call from our customer care executive to schedule an appointment for our Asian Paints Safe Painting Service.
Product and Site Consultation
1. Weekend Makeover
One room painting package
Duration: 2 days
Applicable Area: 250 sq ft carpet area
2. All walls painting
Duration:
4/6* Days
Applicable Area
2 BHK, 1000 sq.ft.
*4 days – Repainting, 6 days-Fresh Painting
Surface/structural pretreatment correction is not included.
Waterproofing and leakage treatment is not included.
Highly recommended painting system to be followed.
No change in material and method of application.
Min 8hrs work time per day.
Material to be made available before start of the work.
4 days completion time is applicable for Repainting and 6 days completion time is applicable for fresh painting.
4/6 days applicable for 2BHK/1000 sq ft.
Mentioned Time taken for the completion of painting is between the start of the painting work at customer site and till completion of the work.
Cracks repair/treatment is not included.
Undulation treatment is not included.
Rectification of dents/imperfection of the surface is not included.
Efflorescence treatment is not included.
Any civil work is not included.
Customer will be required to shift all the valuable items inside the cupboard, drawer or safe place before work starts.
Surface preparation is not accounted in QHM service.
We recommend the house to be unoccupied to optimize the painting process.